The effect of length of time period considered in estimating groundwater recharge with a soil water budget model

de Silva, R.P. (2002) The effect of length of time period considered in estimating groundwater recharge with a soil water budget model. Journal of the National Science Foundation of Sri Lanka, 30(3-4), 109 - 122. ISSN (print) 1391-4588

Full text not available from this archive.
Item Type: Article
Research Area: Geography and environmental studies
Faculty, School or Research Centre: Faculty of Engineering (until 2011)
Depositing User: Automatic Import Agent
Date Deposited: 26 Jun 2012 13:03
Last Modified: 26 Jun 2012 13:03
URI: http://eprints.kingston.ac.uk/id/eprint/8728

Actions (Repository Editors)

Item Control Page Item Control Page